How to prepare a floor for tiling
Updated
Most problems with tiled floors, such as cracked tiles, hollow spots, lifted edges and crumbling grout, start with the floor underneath, not the tiles. Before any tile goes down, the floor needs to be solid, flat, clean and dry. How you get it there depends on what it's made of.
The four things every floor needs
- Solid: no loose boards, no bounce and no crumbling screed. If the floor moves, the tiles crack.
- Flat: dips and humps show through, especially with large tiles, and leave edges that don't line up.
- Clean: dust, paint, old adhesive and grease stop the new adhesive from gripping.
- Dry: a damp floor, or a new screed that hasn't dried out, can make adhesive fail and tiles lift.
Concrete and sand and cement screed
Concrete and traditional screed are good bases for tiles once they're properly dry. New screed takes a long time to dry; a common rule of thumb is around a day per millimetre of thickness for the first 40 mm, and longer after that, so it should be tested rather than guessed.
Small cracks can usually be bridged with a crack-isolation or decoupling membrane. Dips are filled and the floor is levelled with a self-levelling compound. Dusty or porous surfaces are primed so the adhesive bonds properly.
Anhydrite (gypsum) screed
Many newer homes and extensions, especially with underfloor heating, have a calcium sulphate (anhydrite) screed. It needs extra care: the weak surface layer is sanded off, the screed must be fully dry, and it is primed with a suitable primer before tiling, because some cement-based adhesives react with it if they're applied directly.
Timber floors
Timber floors move more than concrete, so they need the most preparation, especially upstairs in bathrooms. Loose boards are screwed down, any bounce is dealt with, and the floor is usually overboarded with tile backer board or exterior-grade plywood, screwed down at close intervals. The tiles are then laid with a flexible adhesive and grout.
Tiling straight onto floorboards is a common cause of cracked floors: the boards move with the seasons, and the tiles and grout crack along the joints between them.
Old floor coverings
- Carpet, underlay, vinyl, lino and cushioned floor need to come up. Tiles can't be fixed securely over anything soft or flexible.
- Old tiles can sometimes be tiled over if every tile is firmly stuck and flat and the extra height works with doors and thresholds. Our guide to tiling over existing tiles explains how to check.
- Old adhesive, paint and residue are scraped or ground off so the surface is sound.
Getting the floor flat
Flatness is checked with a long straightedge across the floor in different directions. The bigger the tile, the flatter the floor needs to be: a small tile can follow a gentle undulation, but a large-format tile will rock or leave raised edges. Low spots are filled and the floor is levelled with a self-levelling compound, which also gives a smooth base over underfloor heating mats.
Things to plan before tiling
- Floor height: boards, levelling compound, adhesive and tiles all add height. Check doors, thresholds and where the floor meets other rooms.
- Underfloor heating: insulation boards and heating mats go down as part of the preparation, before levelling and tiling.
- Wet areas: floors in showers and wet rooms also need waterproofing before tiling.
- Movement gaps: leave a gap around the edges of the room, hidden under the skirting, so the floor can expand slightly.
Floor tiling in Oxford
Floor preparation is the part of the job you never see, and the part that decides how long the floor lasts. We check every floor before quoting, whether it's concrete, screed or timber, and tell you what it needs. We tile kitchen, bathroom, hallway and open-plan floors across Oxford and Oxfordshire.